Can you use multiple hosts, when selecting a subset of tests within a test set in lab managment
Question ID: 107054
0
0

I have a test set in ALM that runs through lab management. After a full run of the test set I frequently need to rerun only the failed tests. If I select those tests and click run it only uses a single host even though multiples are assigned and available. Is there a way to run them in parallel without running the entire test set?

Marked as spam
Posted by (Questions: 2, Answers: 0)
Asked on August 3, 2016 12:53 pm
19 views