ALM repository size not reduced after Test Set purge
Question ID: 105154
4
0

ALM v11.52 SP1.
After running a Test Set / Purge Runs process (Selected All Test Sets), the repository size does not seem to shrink.

Any Ideas? Thanks.

Marked as spam
Posted by (Questions: 22, Answers: 7)
Asked on October 28, 2013 9:23 pm
118 views
Answers (2)
5
Private answer

In the Site Administrator / Site Configuration tab check these parameters.

1) SUSPEND_REPOSITORY_GC = N or the parameter does not exist.

2) REPOSITORY_GC_PROJECT_CLEANUP_INTERVAL - Default is 7 days, shorten the period.

3) REPOSITORY_GC_DELAY_CANDIDATE_TIME - Default is 7 days, shorten the period.

See the Administration Guide for more details.

Marked as spam
Posted by (Questions: 5, Answers: 1)
Answered on October 28, 2013 9:34 pm
0
If you are using QTP, this post may be helpful. http://eyeontesting.com/questions/1341/reducing-hard-drive-space-on-quality-center-server.html
( at October 28, 2013 9:40 pm)
0
Private answer

Also if the repository migration is not completed (upgrading from QC 10 to ALM) The Repository Garbage collection will not occur.

You can check the repository migration status in Site Administrator by going to tools->Repository Migration Status