UFT database checkpoint date is messed up when I run it.
Question ID:
108335
♥ 0 |
I’ve got a database checkpoint in my UFT script and it is checking some dates. When I run it on my main UFT machine, it works great. When I run it in different lab configurations, the dates are not matching and I haven’t changed anything. I’m getting stuck trying to troubleshoot this.
Marked as spam
|
Answers (2)