Configure Traceability Matrix for Results
	Question ID:
	104563
    | ♥ 0 | 
				                 I’m running ALM with Patch 9 installed. About a month ago, I was able to successfully create a RTM for a project that was assigned to a specific release. Today, I am not able to pull **any** data from the traceability matrix, regardless of the specificity of the configuration. Any ideas/help/thoughts out there? My filter is good because I can copy it and paste it into ‘tree view’, and I see the requirements expected. 
                    Marked as spam 
												
				             |