Configure Traceability Matrix for Results
Question ID:
104563
♥ 0 |
I’m running ALM with Patch 9 installed. About a month ago, I was able to successfully create a RTM for a project that was assigned to a specific release. Today, I am not able to pull **any** data from the traceability matrix, regardless of the specificity of the configuration. Any ideas/help/thoughts out there? My filter is good because I can copy it and paste it into ‘tree view’, and I see the requirements expected.
Marked as spam
|