We have a project in our QC instance that is well over 3Gb (Database + repository) and we want to create a copy in the same QC server/instance. We have done this before with large projects and the "internal" copy process (create a new project by copying data from an existing project) takes a long time and makes the source project performance very slow (and sometimes the whole server). We are using Oracle as the back-end, can we just "copy" the database and repository to get a copy of the project? How would/should we do that?
Marked as spam
|
Answers (1)