When I generate a Progress Test Set Graph Dates in the result are showing weekend dates (non business dates) with actual results for fail/pass/no run, etc. even though nobody was running tests on these days. Numbers under Pass are showing the wrong number. Steps: 1. Go to Test Lab 2. select a test s...
0
1
105
We are trying to assign a test set to a cycle however that option is disabled. We have checked for all the permissions in ALM all seem to be enabled. I am the admin of the system however it is even disabled for me.
0
1
23
asked 9 years ago by godawgs
updated 9 years ago by David Hall
Format changes lost after importing test from Excel and then adding it to a test set. See the attached pictures for further explanation. ![alt text][1] [1]: /storage/temp/389-formatting-lost-after-added-to-test-set.png
0
1
107
asked 9 years ago by coleslaw
updated 9 years ago by jameslcoleman
Hello...I am experiencing an issue where action names are not displaying in test lab when I click a button after selecting a new test set that has been added in test lab. If the user clicks on the root folder, then returns to the new test set a second time, the actions will then display for each but...
0
2
38
We have a very large project in QC 11.52 (with ORACLE), how to improve performance on the database or app side? Our new production environment seems to hang a bit on the GetRunValue when we click on a testset with large number of tests up to 9-10k or when we click on the test run module. Sometimes t...
1
2
90
How can I run all of the tests in a test set folder without going into each individual test set and executing the tests?
8
1
51
asked 11 years ago by tlstockton
updated 11 years ago by sammyh
Seems to be a bug in QC. When a test exist in the same test set and first on fails and second time passes, Test status is passed. Should be failed.
1
1
60
asked 11 years ago by test4life
updated 11 years ago by josh-yates
We are on ALM 11.52 patch 1, when we run an automated test suite we want execution summary results to be sent when the test set is through running. So we setup the execution summary report to be sent whenever the test set is executed, we set this up under the automation tab by selecting the "Sen...
9
2
113
asked 12 years ago by qatroll
updated 12 years ago by fuzzy-davis
ALM v11.52 SP1. After running a Test Set / Purge Runs process (Selected All Test Sets), the repository size does not seem to shrink. Any Ideas? Thanks.