Votes
Answers
Views
Question
0
votes
1
answer
229
views
asked 4 years ago by
updated 4 years ago by
Category: Data Analytics
When I am working with a dual axis chart and I right click on the second axis and uncheck "Show header" how do I turn it back on? I am unable to right click anywhere in the are where the axis was before and need to know how to turn this back on. Thanks!
4
votes
1
answer
629
views
asked 4 years ago by
updated 4 years ago by
Category: Data Analytics
I am trying to change a field in the format 'yyyy-mm-dd hh:mm:ss' from a DateTime datatype to a Date datatype 'yyy-mm-dd'. I am accomplishing this in the Formula tool with Left([DateTimeField], 10) but I am unable to change the data type in the formula tool and the output still has the full DateTime...
1
vote
1
answer
251
views
asked 4 years ago by
updated 4 years ago by
Category: Data Analytics
I installed a new version of Alteryx, and now I'm missing a bunch of my Parse, In-Database, Reporting, Documentation, Interface, and Data Investigation tools! Do I need to go out to the Alteryx Gallery and download them for some reason?  How do I get these back?
0
votes
1
answer
162
views
asked 4 years ago by
updated 4 years ago by
Category: Data Analytics
Hi, How do I quickly change multiple fields at once in Tableau? Thanks.
0
votes
1
answer
9834
views
asked 4 years ago by
updated 4 years ago by
Category: DevOps
I'm dumping a rather complicated dictionary to json, and something about the format is causing an error, "circular reference detected." I can't post the code but the basic format is {a[a1: a1,v: [ v1: v1,v2: v2 ] f: [ f1: f1, f2: f2 ]]} filled in from variables through the code and pulling from an A...
0
votes
1
answer
248
views
asked 4 years ago by
updated 4 years ago by
Category: Data Analytics
Hi, I have an Excel spreadsheet on my shared drive, and when I connect to the data and publish, I am unable to update my workbook with the new data.   Thanks, Rob
0
votes
1
answer
754
views
asked 4 years ago by
updated 4 years ago by
Category: Data Analytics
How can I show multiple periods (WTD, MTD, QTD, YTD, and LYTD) across my columns in one row like Microsoft excel?
4
votes
1
answer
224
views
asked 4 years ago by
updated 4 years ago by
Category: Data Analytics
I am trying to automate a process that reads in several xlsx workbooks. The sheet names on these workbooks change periodically so I cannot hard code the sheet names. Is there a way to get the sheet name for each of these files?   Thanks.
0
votes
1
answer
82
views
asked 4 years ago by
updated 4 years ago by
We are currently using LoadRunner Professional 12.60.  We have lots of LoadRunner scripts, so if our team upgrades to LoadRunner Professional 2020 SP2 , will all these scripts work or do I need to re-generate or modify all scripts? Any input would be great.
EyeOnTesting

Welcome back to "EyeOnTesting" brought to you by Orasi Software, Inc.

X
Scroll to Top