Votes
Answers
Views
Question
0
votes
1
answer
70
views
We've created a Test Lab field called Build (TC_USER_02). What I want to do with my daily regression execution tests is get the version number of the current build from our database and insert that value (typical format #.#.####.###) into the Build field in the Test Lab during the test run so that w...
2
votes
1
answer
38
views
asked 15 years ago by terric
updated 13 years ago by jeffrey-gardner-1
In Performance Center 11, the LoadTest System Resources graphs are only showing the controller box (even though the test is running with a separate load generator). Is there a setting or configuration we missed to get the load generator boxes shown in the graph as they were in PC 9.5? Thanks!
6
votes
1
answer
84
views
asked 15 years ago by tlstockton
updated 15 years ago by sammyh
I am unable to install the Excel and Word add-ins to export items to QC. I get the error "The filename, directory name or volume label syntax is incorrect" for the Word Add-in. Similar error for the Excel Add-In. This only occurs on the PC's running Microsoft Office 2010 64-bit.
3
votes
1
answer
325
views
asked 15 years ago by The Danny
updated 15 years ago by Captain Mercury
I am having trouble importing my SiteScope 11 license. It imports sucessfully, but when I restart SiteScope service, it then tells me I don't have enough points. When I go back to preferences after the service restart, it says there is no valid license intalled. The license has been generated on Web...
0
votes
1
answer
56
views
I am trying to migrate HP Quality Center 9.2 databases from one server to another. Is there a tool or some set of steps to make that happen? I see a lot of files (xml and txt) which contain the name of the current database server. Am guessing there's a command line tool or something that will do all...
0
votes
1
answer
39
views
asked 15 years ago by c5tats
updated 15 years ago by dennis-stagliano
Tags:
In Quality Center 9.2, which password is referenced by the parameter in the dbid.xml file? Is it the DB Admin user password that is used to create/update project databases or is it the QC User password?
1
vote
3
answers
39
views
asked 15 years ago by ghopson
updated 14 years ago by bubblehead712
I have told my users that it is not possible to introduce Logic into manual Test cases. For example, populating the parameters of a test case based upon the resulting parameters from a previous case. Am I correct in this assumption or are there scripting methods that would allow this? Thanks, Gary
0
votes
1
answer
24
views
asked 15 years ago by anita
updated 13 years ago by travel-ready
Category:
Application Lifecycle Management
I work in a place that is using ALM to house all requirements in ALM under a single release (example 1.0). When I run Requirement Traceability reports, they will never be 100% traced to tests because not all requirements will be tested. An example may be a requirements to build a process for purchas...