Votes
Answers
Views
Question
0
1
14
I see how to do value-mapping (for Status fields not matching between my two endpoints in connectAll, for instance). but we have a map I need to do with two fields that have many values, can I do this from a list maintained in Excel?
2
1
195
Using the below code I am trying to import an Excel spreadsheet into UFT datatable. My Excel spreadsheet only has one worksheet called "TestData". Only thing is, instead of importing into the DataTable sheet called "TestData", it always goes into the GlobalSheet instead of my TestDat...
1
1
91
We just recently got ALM and want to put our existing LeanFT tests into ALM. Is there an easy way to do this?
0
1
123
asked 7 years ago by soapy-smith
updated 7 years ago by pt-barnum
We have ALM 12.55 and just created a QCP Export of a large project of ours and ended up with a 5Gb "QCP" file. We cannot create a project from the QCP, getting "Failed to create project" errors.
0
1
46
asked 8 years ago by soapy-smith
updated 8 years ago by pt-barnum
We are upgrading our HP-Synchronizer server and wanted to use a NEW Server VM with a newer OS (Win2012) on it. We started with HP-Sync 12.20 and performed (for each link) Backup Link with data. These ended up creating separate ZIP files for each link. Then, we installed a new/blank load of HP-Sync 1...
0
2
305
Hi! I have installed the Word add-in but cannot find any instructions on how to actually import the word file to HP ALM. Is there a How-to guide some where? KR, Elisabeth
0
1
26
Hello, We are getting a "null exception" error when trying to import a qcp file in Site Admin.
0
1
258
asked 9 years ago by scruffy
updated 9 years ago by josh-yates
Index out of range. Must be non-negative and less than the size of the collection. Parameter name: index Error occurs during BPT Iterations import. 1. Create Iterations Group with the same # of iterations as needed to import 2. Export the data (.csv file) 3. Modify the exported file with correct dat...
8
1
49
asked 10 years ago by derlweldon
updated 10 years ago by sammyh
Are there any differences for projects under version control, are there any differences on the approach or formatting the Excel spreadsheet?