Votes
Answers
Views
Question
2
votes
1
answer
68
views
asked 5 years ago by
updated 5 years ago by
Please clarity what does this message mean? . "Passed -- Check connectivity between the Controller and load generators - No check done - this host is not set as Controller purpose"
0
votes
1
answer
482
views
asked 5 years ago by
updated 5 years ago by
0
votes
1
answer
198
views
asked 5 years ago by
updated 5 years ago by
We would like to know whether the communication between Load Generator to Controller, or between Controller to between Load Generator needs port 80? How is Port 80 used in ALM Performance Center 12.55?
2
votes
2
answers
78
views
asked 6 years ago by
updated 6 years ago by
We recently upgraded to ALM-PC 12.62, and now when in My Performance Center and Performance Center Administration, we are now having to log back in after being idle for one hour. Is there any way to disable this feature?
0
votes
1
answer
35
views
asked 6 years ago by
updated 6 years ago by
I needs to create a report of the dates and who modified a script with Version Control enabled on all projects. I don't think there is an actual report, in ALM version 12.55, that could be run to provide this information; however, i can pull the data from the ALM projects database schema, if I could...
1
vote
1
answer
58
views
asked 6 years ago by
updated 6 years ago by
We recently upgraded to our ALM-PC environment to version 12.60. We did also upgrade our servers to Windows Server 2016 and our Oracle database to a supported version for ALM. When we log into Performance center Administration site-> Projects, we do not see any of our projects listed. However, when ...
0
votes
1
answer
357
views
asked 6 years ago by
updated 6 years ago by
I am trying to figured out best way to purge Results/Runs. I run couple purge options; but, the File Repository size is not impacting at all. Please provide purge steps which removes (Test Runs, Test Results, and reflects repository as well)
0
votes
1
answer
43
views
asked 6 years ago by
updated 6 years ago by
Category: Test Automation
We recently upgrade our LoadRunner testing lab to version 12.62. We also upgrade our machines OS from Windows Server 2012 to Windows Server 2016. No we are experiencing failure when replaying or recording new RTE scripts.
EyeOnTesting

Welcome back to "EyeOnTesting" brought to you by Orasi Software, Inc.

X
Scroll to Top